Construction Alert for the Weeks of October 16 and October 21, 2023

  1. Home
  2. Construction Alerts
  3. Construction Alert for the Weeks of October 16 and October 21, 2023

Lane Closures possible Tuesday 10/17 through Wednesday 10/25 between 7:00 PM and 6:00 AM  (except no lane closures on Saturday, 10/21) as follows:

  • I-91 NB (Exit 17 to Exit 20) double right lane closure for keyway milling, rumble strip removal, and shoulder strengthening – Tuesday, 10/17, Wednesday, 10/18, and Thursday, 10/19, between 9:00 PM and 6:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double left lane closure for keyway milling and rumble strip removal – Tuesday, 10/17, and Thursday, 10/19, between 7:00 PM and 6:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double left lane closure for shoulder strengthening – Friday, 10/20, between 9:00 PM and 6:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double right lane closure for paving – Sunday, 10/22 between 9:00 PM and 2:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double left lane closure for paving – Sunday, 10/22, between 2:00 AM and 6:00 AM.
  • I-91 NB (Exit 17 to Exit 20) double right lane closure for traffic shift– Monday, 10/23, and Tuesday, 10/24, between 9:00 PM and 12:00 AM.
  • I-91 NB (Exit 17 to Exit 20) double left lane closure for traffic shift– Monday, 10/23, and Tuesday, 10/24, between 12:00 AM and 6:00 AM.
  • I-91 NB (Exit 17 to Exit 20) double left lane closure for traffic shift– Wednesday, 10/25, and for temporary barrier installation between 9:00 PM and 6:00 AM.

Ramp Closures

  • 10/24 – Preston Ave. on-ramp to I-91 NB closed from 10:00 PM to 6:00 AM
  • 10/30 – I-691 EB Exit 1A closed from 10:00 PM to 6:00 AM (Ramp 6E 9N)
  • 10/30 – Route 66 WB Exit 1A closed from 10:00 PM to 6:00 AM (Ramp 6W 9N)

Click here for detour route maps

Next Post
Construction Alert for the Week of October 29
Previous Post
Lane Closures Begin Sunday Night, October 1, 2023